June 2022
May 2022
September 2021
August 2021
July 19, 2021
July 14, 2021
June 2022

Construction Updates

Work on the subdivision roadways and lots continues as favourable weather has allowed the cut & fill to take place throughout the site. Currently the civil contractor is stripping top soil and transporting it off site. The lower lots for Townhouses building 18-20 have been prepped and are ready for detailed excavation & footings. The site is getting setup with temp power and our temp fencing panels have arrived.

May 2022

Development Update

Work is underway for the 2182 Church Rd subdivision. The civil contractor has removed the existing farmhouse and is currently stripping the top soil and removing vegetation from the site. Environmental measures are being established to handle the run off from the site and protect the surrounding areas. The road sub-base is being established in the north east corner of the site to allow for the first lots to be built. Construction of the first foundation is likely for the end of June / start of July.

church-road-update-2022
church-road-update-2022
September 2021

Development Update

The site is currently being cleared of trees and shrubs. C-1 is installing temporary access roads and installing the environmental measures. The was a 2 week delay due to the site having possible archeological artifacts. The site was reviewed by an archeologist and deemed to be clear of any archeological significance.

church-road-september-2021-update 2
church-road-september-2021-update 3
church-road-september-2021-update 4
church-road-september-2021-update 1
August 2021

Development Update

We are continuing with the clearing of the site and establishing our environmental safety measures. We are looking to start removing top soil from the site in the coming weeks.

July 19, 2021

Development Update

Starting July 19, Tree falling will commence. In the coming weeks, site grading will occur with excess soils moving off-site.

July 14, 2021

Development Update

A detailed tree survey was performed on the week of July 2 to determine the trees that are to be saved. An environmental consultant performed an audit of the site and no bird nests were found. The 1st phase of our construction program has started with clearing and grubbing of the brushes on site.